石油工程英语单词(2)

2025-08-15

泥浆:reverse circulate 中途循环泥浆:break circulation 分段下钻:RIH in stages 通井:control trip 划眼:reaming 倒划眼:back reaming 接单根:make connection

滑、割大绳:slip and cut drilling line by ton-mile 保养设备:maintain the equipment 修理设备: repair (or fix) the equipment 保养顶驱:service TDS 保养冲管:lubricate wash pipe 待工日费:standby rate

今天零日费:there is no day rate today(zero day rate today) 我可以为您做,但必须收费,请理解

I can do for you and I have to charge(back charge) you. Please give me full understanding.

不在我的职责范围之内,我要汇报领导,一有消息会马上告诉你

It is out of my power and I have to report to my boss. I will let you know as soon as I get news.

大鼠洞:rat hole 小鼠洞:mouse hole

钻具错扣:the connections are crossed 钻具粘扣:thread is galled 丝扣坏了:the thread is damaged 起钻错扣:alternate the connections

新钻具或接头磨扣:break in the new tool joint 新钻头磨合:break in the new bit PDC钻头井底造型:shape the PDC bit

第3页

跳钻:rough drilling( vibrated drilling, bit is bouncing) 蹩钻:rough drilling(drilling torque is abnormally high) 缩径:tight hole 起钻遇卡:get overpull 下钻遇阻:set weight

部分漏失:partially lost circulation 全部漏失:totally lost circulation 盲钻:blind drilling 堵水眼:bit jets are blocked 掉水眼:bit jets are lost 憋压:the pressure is built up 卸压:release pressure 试压:pressure test 功能测试:function test 双方独自检查:double check

地质:geology

地质专业人员:geologist 物理:physics

地球物理勘探: geo-physical exploration. 测井:logging

电测井作业:wireline logging operation 泥浆测井:mud logging 井(副词“好”含意):well 拓展记忆: 井眼:bore hole 油气井:oil&gas well 试井:well test 井下:down-hole

井下作业:down-hole operation

第4页

第2节 石油钻井方法基础词汇

钻井原理:the principles of drilling

顿钻钻井:percussion drilling,cable-tool drilling 旋转钻井:rotary drilling

大位移井:big distance( or extended ) well 侧钻井:sidetracking drilling 水平井:horizontal well 探井:wildcat,wildcat drilling 深井:deep well 浅井:shallow well 老井:maturing well

丛式钻井:cluster well drilling 煤层气井:coal-bed gas well 生产井:production well 报废井:abandoned well 停产井:none-production well 井下情况:downhole condition

第3节 石油钻井技术基础词汇

技术规范,技术指标,技术性能: specification

拉伸:tension

拉伸强度:tensile strength 弯曲强度:bending srength

最小屈服强度: minimum torsional strength 应力:stress 压力:pressure 应力点:stress point

第5页

压力降:pressure drop 压力梯度:pressure gradient 回压:back pressure 大气压:atmosphere

压差: pressure difference

静液柱压力:static fluid cloumn pressure 地层压力:formation pressure 坍塌压力:collapse pressure 破裂压力:fractured pressure 液体:liquid 固体:solid 气体:gas,air 正的:positive 负的:negative 水平的:horizontal 垂直的:vertical

第4节 石油钻井参数基础词汇

钻压:WOB(weight on bit)

转盘转速:RPM(rotation per minute) 泵压:SPP(slurry pump pressure) 泵冲:SPM(stroke per minute) 排量:FR(flow rate) 大钩负荷:hook load

扭矩:torque 反扭矩:reactive torque 钻速:ROP(rate of penetration) 顶驱:TDS(top drive system) 钻井周期:drilling period

第6页

钻井成本:drilling costs 井眼尺寸:hole size

垂深: TVD(total vertical depth) 井深:MD(measured depth)

水平位移:horizontal displacement 井斜角:angle( or hole inclination) 方位角:azimuth 井眼环空:annulus

第5节 石油钻井作业现场工作人员名称

甲方:oil company(operator) 钻井承包商:drilling contractor

第三方(分包商)the third party(sub-contractor) 钻井经理:drilling manager 监督:supervisor

钻井监督:DSV(drilling supervisor) or Companyman 地质监督:geologist 泥浆工程师:mud engineer 固井工程师:cementing engineer 泥浆录井工:mud logger

钻井队:drilling crew,drilling team 钻井1班:drilling shift one 总经理:general manager 总工程师:chief engineer

项目经理:project manager(country manager) 作业经理:operation manager 财务经理:financial manger 会计:accountant

第7页


石油工程英语单词(2).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:申请电力工程工程师个人专业技术工作总结

相关阅读
本类排行
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 7

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xuecool-com QQ:370150219