合同英文(整理16篇)(合同英文怎么写)(6)

2025-06-29

A.同意买方退货,并将退货金额以成交原币偿还买方,并负担因退货而发生的一切费用,包括运费,保险费,商检费,仓租,码头装卸费以及为保管退货而发生的一切其它必要费用。

a. Agree to the rejection of the goods and refund to the Buyers the value of the goods so rejected in the same currency as contracted herein, and to bear all expenses in connection therewith including freight, insurance premium, inspection charges, storage, stevedore charges and all other, necessary expenses required for the custody and protection of the rejected goods.

B. 按照货物的疵劣程度,损坏的范围,将货物贬值。

b. Devaluate the goods according to the degree of inferiority, extent of damage

C. 调换有瑕疵的货物.换货必须全新并符合本合同规定的规格、质量和性能.卖方并负担因此而产生的一切费用.对换货的质量,卖方仍应按本合同第13条规定的保证期保证。

c. Replace the defective goods with new ones which conform to the specifications, quality and performance as stipulated in this Contract. The Seller shall, at the same time, guarantee the quality of the replacement goods for a further period as specified in Article 13 of this Contract.

16. 不可抗力事故 FORCE MAJEURE:

由于不可抗力原因,如战争、火灾、水灾、台风、地震或未能取得政府许可等发生在货物制造或运输过程中,导致卖方交货迟延或不能交货时卖方不承担责任。但卖方应在事故后的十四天内通知买方,并将事故发生地政府主管机关出具的事故证明书用空邮寄交买方,并取得买方认可。在上述情况下卖方仍应采取一切必要措施尽快交货。如果该事故持续超过五周以上时买方将有权撤销本合同。

The Seller shall not be held responsible for the delay in shipment or non-delivery of the goods due to Force Majeure such as war, serious fire, flood, typhoon, earthquake or failure of obtaining government approval(s) which might occur during the process of manufacturing or in the course of loading or transit. The Seller shall advise the Buyer of the occurrence mentioned above and within fourteen (14) days thereafter, the Seller shall send by airmail to the Buyer for their acceptance a certificate of the accident issued by the Competent Government Authorities where the

accident occurs as evidence thereof. Under such circumstances the Seller, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than five (5) weeks, the Buyer shall have the right to cancel the Contract.

17. 仲裁 ARBITRATION:

凡因执行本合同所发生的或与本合同有关的一切争议,应由双方通过友好协商予以解决。如果协商不能解决,应提交中国国际经济贸易仲裁委员会根据中国国际经济贸易仲裁规则在上海进行仲裁。该仲裁委员会作出的裁决是最终的,买卖双方均受其约束。

All dispute in connection with this Contract or the execution thereof shall be settled through friendly negotiation. In case no settlement can be reached, the case may then be submitted to Shanghai International Economic and Trade Arbitration Commissio for arbitration which shall be conducted in accordance with the CIETAC's arbitration rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties.

18. 特别条款 SPECIAL PROVISIONS:

本合同由买方和卖方共同签署,一式四份,买卖双方各执两份。本合同自双方签字后立即生效。附件是合同不可分割的组成部分,与合同具有同等法律效果。

This Contract is signed by both the Buyer and the Seller in four (4) copies, each side holds 2 copies. The Contract shall become effectiveness after its signing by both the Buyer and the Seller.

All the appendix of the contract are integral parts of the contract and have the same legal force as the contract.

本合同以英文和中文书写,二种文字具有同等效力。

This Contract is written in both English and Chinese, which have equal validity.

买方Buyer 卖方Seller

Signature: Signature:

篇10:英文合同

贷款方(Lender)

身份证件号码(ID Number.)

地址(Address)

电话(Tel)

借款方(Borrower)

法定代表人(Representative)

职务(Title)

地址(Address)

电话(Tel)

借款方是一家从事生产销售喷砂和抛光研磨纤维石产品;(砂石品业务)的公司:

The Borrower operates Manufacture and sale of the spray-stone (the Stone Business);

借款方因生产经营需要,向贷款方借款。双方本着互惠互利的目的,友好协商,特制订本合同。

For its production and operation, the Borrower intends to borrow money from the Lender. For the mutual benefits, both Parties agree to conclude this Contract.

第一条 借款金额 Article 1 Amount of Loan

借款金额280,000美元 (大写:贰拾捌万美元)

US$280,000(Capital Letter: Two Hundred Eighty Thousand US Dollars)

贷款方在签订本书面合同之前,已向借款方提供280,000美元贷款。借款方在此确认已经收到贷款方通过银行转账方式提供的280,000美元贷款。

The Lender agrees to advance the Loan US$280,000 to the Borrower prior to the signing of this Contract. The Borrower hereby confirms that it has received the Loan US$280,000 advanced by the Lender through bank transfer.

第二条 借款用途Article 2 Scope for Use

本合同所约定的贷款仅用于借款方生产销售砂石品业务,不得挪作它用。

The loan hereof is only for Borrower‘s Stone Business and shall not be appropriated for other use.

第三条 利率及还款期Article 3 Interest and Term Repayment

1. 如果借款方在合同约定的还期限内还清借款,贷款方则不收取借款利息。

The Lender agrees that no interest will be payable on the Loan for the term of the loan while the Borrower is not in default of repayment.

2. 借款方应按照以下还款期向贷款方偿还借款:

The Borrower agrees to repay the Loan to the Lender in accordance with the following repayment schedule:

在本合同签订之日起十二个月内偿还借款 美元;

Repayment due on or before the date 12 months from the date of this agreement.

在本合同签订之日起二十四个月内偿还借款 美元;

Repayment due on or before the date 24 months from the date of this agreement.

在合同签订之日起三十六个月内偿还借款 美元。

Repayment due on or before the date 36 months from the date of this agreement.

3. 借款方应根据贷款方合理要求的时间、场所和方式还款。

All repayments shall be made at the time and place and in the manner reasonably required by the Lender.

第四条 管理费用Article 4 Management Fee

1.借款方同意在借款期内,向贷款方支付管理费用,管理费用的金额为借款方砂石品业务销售总额1.4%.

The Borrower agrees to pay to the Lender a sum equivalent to 1.4% of the total income received by the Borrower, from the sales turnover of the Stone Business, during the term of the loan.

2. 借款方同意按第4.3条约定自每一财务季度结束之日起三十日内向贷款方支付管理费用,付款时间表如下:

Subject to clause 4.3 the Borrower agrees to pay the Management Fee to the Lender in arrears on or before the date 30 days following the end of the previous financial quarter in accordance with the following payment schedule:

每年一月一日至三月三十一日期间的管理费用;

Management Fee calculated for the period 1 January – 31 March each year.

每年四月一日至六月三十日期间的管理费用;

Management Fee calculated for the period 1 April – 30 June each year.

每年七月一日至九月三十日期间的管理费用;

Management fee calculated for the period 1 July – 30 September each year.

每年十月一日至十二月三十一日期间的管理费用。

Management Fee calculated for the period 1 October – 31 December each year.

3.本合同签订之日起的首个季度管理费用自20xx年 月 日起正式开始计算。

Management Fee due in respect of the financial quarter within which the date of this agreement falls will only become due on the date of 20xx.

4. 如果借款方在本合同签订之日起两年内提前还清借款280,000美元,借款方支付管理费用的义务自合同签订之日起两年后终止。

In case the Borrower repays the loan US$280,000 within 2 years from the date of this agreement then the obligation to pay the Management fee will cease at the end of the 2 year period.

第五条 浮动抵押 Article 5 Floating Mortgage

1. 借款方以其现有的和将来拥有的生产设备、原材料、成品和半成品向贷款方提供抵押。

The Borrower agrees to Mortgage to the Lender all equipments, raw materials, finished and unfinished goods owned now and in the future by the Borrower.

合同英文(整理16篇)(合同英文怎么写)(6).doc 将本文的Word文档下载到电脑 下载失败或者文档不完整,请联系客服人员解决!

下一篇:夫妻协议范文(锦集13篇)(夫妻协议怎么写格式怎样的求教)

相关阅读
本类排行
× 游客快捷下载通道(下载后可以自由复制和排版)

下载本文档需要支付 7

支付方式:

开通VIP包月会员 特价:29元/月

注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信:xuecool-com QQ:370150219